facebook twitter google youtube linkedin

Company news


On-site survey of the 30-meter high pole at base 6 of Shenzhen Bay Port completed

On-site survey of the 30-meter high pole at base 6 of Shenzhen Bay Port completed


The contract includes 6 bases of 30-meter high poles and lifting systems, which need to be completed before the Spring Festival.

The company has arranged personnel to go to the site for inspection. Due to the dense population and large number of vehicles at 

the port, installation and commissioning may be carried out in batches.


highway gantry frame|high power LED lamps

CATEGORIES

LATEST NEWS

CONTACT US

Contact: Mr.Su

Phone: +86-18666626346

Tel: +86-18666626346

Email: Info@cantonstructures.com

Add: Room 203, 2nd Floor, No. 4, A5 Area, Lixin Road, Huimei New Village, Xintang Town, Zengcheng District, Guangzhou, China

Leave a message

 
Top