The installation of two highway gantry frame towers of over 32 meters produced by the company has been completed.
This contract includes the measurement, design, production and installation of two 32-meter gantry frames. Our company sent a backbone force and it took 4 days to complete the installation. During the entire gantry hoisting process, traffic was not blocked due to the requirements of the highway traffic police, so we only gave 8 minutes.